BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The Contractors Framework is a vital part in the delivery of our Corporate Vision, particularly supporting maintaining and improving our assets as well as playing a part in inclusive regeneration and place making. The projects commissioned through our Framework are a tangible demonstration of the public value that Scottish Canals aims to deliver, as well as increasing the wider socio-economic sustainability of the local communities that the canals run through.
No supplier information available.
This procurement was divided into 8 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Lot 1 – Civils including design 1,440 days (≈3.9 yrs) | - | active |
| Lot 2 Lot 2 – Landscaping including design 1,440 days (≈3.9 yrs) | - | active |
| Lot 3 Lot 3 – Hydrographic and Topographic Survey / Site Investigation / Ground Investigation 1,440 days (≈3.9 yrs) | - | active |
| Lot 4 Lot 4 – MEICA including design - (Mechanical / Hydraulic / Electrical / Controls / Telemetry) 1,440 days (≈3.9 yrs) | - | active |
| Lot 5 Lot 5 – Fabrication 1,440 days (≈3.9 yrs) | - | active |
| Lot 6 Lot 6 – Dredging 1,440 days (≈3.9 yrs) | - | active |
| Lot 7 Lot 7 - Regional Construction Works 1,440 days (≈3.9 yrs) | - | active |
| Lot 8 Lot 8 - Professional Service - Engineering and Built Environment 1,440 days (≈3.9 yrs) | - | active |
Published by the buyer on this notice. Check the original notice — details change and are not updated here.