BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Phase 1 will be split into 2 stages and our requirements are:
The appointment of Principle Designer to oversee, co-ordinate the design and implementation of the project, advising the Client on risks, and compliance to regulations. Support, prepare and administer - the BSA (Building Safety Act) submissions (2 Stage) to the regulator, including co-ordination of the comments/feedback, and validation.
Works scope Phase 1: Cleanroom Specialist Company to refurbish and / or design (if any needed) and qualify the existing St Thomas’ Lower Ground Floor Aseptic unit. The Aseptic Unit is to provide cytotoxic chemotherapy preparation for children and Adults. The Unit comprises 6 rooms of which includes: 2 change rooms (D and C Grades), 1 support room (D) and 2 manufacturing rooms (C Grade). New Isolators and may be gassing isolators are to be installed.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Pollen Maddox | - | £38,800 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £38,800 initial term | Pollen Maddox | active |