Construction phase attendance (Consultancy/technical observations) re M49 Link Road to include sheet piled wall redesign, further investigation works required at M49 gyratory stub and possible remediation design. Site supervision is required to ensure specialist engineering activities are carried out according to the design and specification. Direct Award under WECA Professional Services Framework 2.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| AECOM Ltd | - | £100,000 | - |