To facilitate CPI server room to be moved locations, CPI requires first ranked supplier on it's Electrical Works Framework to provide and install a 63A single-phase dual-feed changeover switch, fed via T-block tap-in box and H-tap-in box connections. The changeover switch will supply a single-phase distribution board serving 2 × 16A commando socket outlets and 1 × 20A air-conditioning supply.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| JBA Engineering ltd | - | £35,908 | 1 lot Lot 2 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 2 | - | JBA Engineering ltd | active |